Green Energy Facility: Powering Phoenix with Clean Technology
A battery manufacturing and solar research facility built to the highest industrial and environmental standards.
- Client: EcoPower Solutions (2023)
- Project Value: $185 Million
- Time to Completion: 26 months
- Location: Phoenix, 2023
- Project Type: Industrial
- Project Size: 620,000 square feet on 40 acres
Project Overview
The Green Energy Facility is a large industrial campus on the edge of Phoenix, combining a battery manufacturing plant, a solar research centre and offices for more than 600 staff. The main production hall spans over 400,000 square feet with clean-room zones, heavy crane rails and specialist ventilation, while the research centre houses test laboratories and a rooftop solar array used for live trials. The whole site was designed to run on renewable power, with on-site solar generation, battery storage and a water recycling plant that dramatically reduces demand on the local supply.
Challenges
Building the Green Energy Facility meant working through extreme desert heat, on a site with poor ground conditions and no existing utilities. The production hall needed long, column-free spans and very flat floors for automated equipment, and clean-room areas demanded strict control of dust during construction. The client also required the plant to begin trial production before the research centre and offices were finished.
Solutions
Structo planned the Green Energy Facility around the needs of the production line, the desert climate and a phased start-up. Specialist engineering, careful sequencing and a strong focus on worker welfare in the heat allowed the team to deliver an advanced industrial building safely and on schedule.
Ground Improvement Before Foundations
Stone columns strengthened weak desert soils, giving the heavy production floor a stable, even base.
Long-Span Steel Trusses
Deep roof trusses created wide, column-free halls for automated lines and overhead cranes.
Laser-Levelled Super-Flat Floors
Floors were laser-screeded and tested to tight tolerances for robotic and automated equipment.
Heat Safety Programme
Early start times, shaded rest areas and constant water supplies kept the workforce safe all summer.
Production Hall Handed Over First
The hall was finished and commissioned first, so trial production began while the offices were built.
Results
The Green Energy Facility started trial production four weeks early and reached full output within its first year. On-site solar and storage supply most of the plant's daytime energy, and the water recycling system has cut mains water use by more than half. The project created hundreds of local jobs and has made the client one of the region's leading manufacturers of clean energy technology.